Double Handle Basin Faucet Brass Chrome Deck Mounted Washbasin Mixer Mixer (M51-110)

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO.
M51-110
Surface Treatment
Polished
Style
Traditional
Function
Basin Mixer
Installation
Deck Mounted
Surface Finishing
Chrome
Certification
CE, RoHS
Material
Brass
Number of Handles
Double Handle
Color Options
Chrome, Gold, Rose Gold, Black
Product Description
Basin Faucet Banner
M51-110 Detail

Double Handle WashBasin Faucet Mixer

  • Double-lever, vertically-mounted design
  • High-quality Ceramic heads for durability
  • Available with or without G11/4 pop-up waste
  • Single-hole easy assembly
  • G1/2 or G3/8 M10x1 flexible connectors
  • Premium Brass material construction
  • Elegant Chrome finishing
Technical Specifications
FeatureDetails
MaterialHigh Grade Brass
CartridgeCeramic Heads
Cartridge Life time500,000 cycles
AeratorIntegrated High-Flow Aerator
Working temperature0 - 95 Degree Celsius
Working pressure0.05 - 1.2 MPA
FunctionCold and Hot Water Mixer
Accessories2pcs Stainless Steel Flexible Hoses
MOQ100 pcs
PackingCloth bag / inner box / outer carton
Product Showcase
Gallery Image 1 Gallery Image 2 Gallery Image 3
Gallery Image 4 Gallery Image 5 Catalog Preview
Production & Logistics
Manufacturing
Warehouse Packaging
Shipping Logistics
Frequently Asked Questions
Q1: When can I get the quotation if I send an enquiry?
We usually quote or reply within 5 minutes to 6 hours after receiving your inquiry.
Q2: What is your MOQ? Can we order small amounts?
Usually, our MOQ is 1,000pcs. However, trial orders and specific requests can be negotiated.
Q3: How can we get a sample to check quality?
After price confirmation, you can require samples. We charge for sample costs, which are refundable if your final order quantity exceeds the MOQ.
Q4: Can you provide customized designs?
Yes, we can supply customized sizes, material grades, and coatings. We also provide packaging design based on your requests.
Q5: What is your standard payment term?
Normally, we require a T/T 30% down payment, with the 70% balance paid before shipment, or an irrevocable L/C at sight.
Q6: What is the typical lead time for mass production?
Mass production usually takes around 30 to 35 days.

Related Products